| 1976 | Company established |
| 1977 | Slipforming technology improved with the experience in jacking the formwork with a hydraulic jack system applied to the placement of cassisons |
| 1978 | Entered into technical cooperation with GSB, Germany, importing the conical slipform technology |
| 1980 | Set the record of simultaneously slipforming 10-8.5m silos |
| 1981 | Successfully acquired "Conical Slipforming" technology |
| 1982 | Undertook the construction of cement silos for P.T. Indocement Tunggal Prakarsa, and grain silos and pellet silos for Bogasari Flour Mills in Indonesia, opening up the door to overseas market of construction Undertook Chien Kuo N-S Viaduct, section from Chang An E. Road to Jen Ai Road. |
| 1983 | Set the record of simultaneously slipforming 12-10m bins |
| 1984 | Initiated the application of slipforming to non-round-sectional highrises Matched prestressing with slipforming |
| 1985 | Undertook the construction of the first large-scale parking tower in Taiwan |
| 1986 | Undertook the construction of a 138-m chimney, the tallest ever built by our own fellow people Experienced and acquired the technology of laying refractory for a chimney |
| 1989 | Undertook the construction of the chimney for the first incineration plant in Taiwan |
| 1991 | Successfully completed the turn-key project of 60,000 ton grain silos |
| 1992 | Applied "integrated technology of combing slipforming with steel structure" to highrise plant Introduced the egg-shaped form system from RSB-Roundtech, Austria and pre-stressing system from Vorspann-Technik, Austria |
| 1993 | Experienced the technology of steel liner 6.7 m x H 250 m Experienced the technology of hoisting 600-ton steel liner Experienced the welding of nickel-alloy wallpaper |
| 1994 | Completed the first of the two 250-m chimneys, a turn-key project and the tallest chimneys ever constructed by our own fellow people Set up Ting Tai Construction Co., Ltd. Representative Office in Indonesia Undertook the expansion project of silo complex for Bogasari Flour Mills in Jakarta and Surabaya, with the total capacity reaching 727,180 tons Completed Pali Egg-shaped Digesters and Energy Recovery System (civil portion) |
| 1995 | Set up Ting Tai Construction (S) Pte. Ltd. in Singapore Completed turnkey project of two 250-m chimneys for units 5-8 at TPC's Taichung Fossil Power Station, which was awarded the First Place in 1995 Public Works Quality Evaluation by Ministry of Economic Affairs and the Superior Grade in 1995 Public Works Quality Evaluation by Executive Yuan Pali Egg-shape Digesters and the Energy Recovery System (civil portion) won the Superior Grade in Public Works Quality Evaluation by Executive Yuan |
| 1996 | Awarded by Ministry of Interior Affairs "Award of 1995 Outstanding Construction" Achieved ISO 9002 International Quality Management System |
|
| |
|
|